CCEP Darwin
Renewable generation for Coca-Cola Darwin.
Darwin, NT
A large-scale solar installation generating renewable energy for the Coca-Cola facility in Darwin.

Annual production
Reported.
Panels
Jinko 415 W.
PROJECT OVERVIEW
Commercial solar in the Top End.
CLIENT
CCEP Darwin
COMMISSIONED
Late 2022
01 / THE CHALLENGES
A large commercial installation at Coca-Cola Darwin called for a solar system at operational scale.
Commercial scale
The project involved 641 solar panels.
Darwin location
Delivery took place at the Coca-Cola Darwin site.
THE SYSTEM AT WORK
From site to useful energy
Site assessment
Converts sunlight into clean electricity.
Tailored design
Upgraded infrastructure moves energy safely across the site.
Delivery and care
On-site generation helps reduce reliance on the grid.
02 / THE SOLUTION
We completed this commercial solar in project late 2022 with 641 Jinko 54H L4-(V) 415w panels.
Modules
641 Jinko 54H L4-(V) 415 W panels
Completion
Late 2022
DS Energy completed the project in late 2022.
03 / THE RESULTS
Thanks to a large scale solar installation by DS Energy, CocaCola Darwin is now generating 420MWh of renewable energy each year.
Annual production
Solar panels
On-site generation
The system produces renewable electricity for the Darwin site.