QIC Merrifield
A shopping centre roof generating clean power.
Merrifield
Rooftop solar on QIC Merrifield shopping centre, commissioned in May 2023.

System capacity
Shopping centre roof.
Annual production
Reported.
Performance ratio
Reported.
PROJECT OVERVIEW
Solar at QIC Merrifield.
CLIENT
QIC Merrifield
COMMISSIONED
May 2023
01 / THE CHALLENGES
The rooftop installation was planned for a working shopping centre.
A substantial rooftop
The system covers part of the centre’s roof.
Commercial output
The design was sized at 401.4 kW.
THE SYSTEM AT WORK
From site to useful energy
Site assessment
Converts sunlight into clean electricity.
Tailored design
Upgraded infrastructure moves energy safely across the site.
Delivery and care
On-site generation helps reduce reliance on the grid.
02 / THE SOLUTION
In May of 2023, DS Energy completed the installation of 892 Astronergy CHSM60M- HC-450w panels on the roof of QIC Merrifield shopping centre.
Capacity
401.4 kW
Modules
892 Astronergy 450 W panels
The installed system uses Astronergy CHSM60M-HC-450 W panels.
03 / THE RESULTS
With a solar system size of 401.4kW, this spectacular rooftop is now generating 542.1MWh of clean energy annually with an 82.4% performance ratio.
Annual production
Performance ratio
System capacity
Renewable supply
The roof now generates clean electricity.
Measured performance
The project reports an 82.4% performance ratio.
KEEP EXPLORING
Related projects
Considering retail rooftop solar?
Explore a system designed around your building and energy profile.



